Skip to content. | Skip to navigation

Opportunity
Data pubblicazione: 2019 Ultimo aggiornamento: 2026

Industrial Development Area - Via Panizzardo management

P.zza Garibaldi, 9 - 24043 - Caravaggio (BG)
Property

Public

Total GIA

36.263 m²

Functions

Industrial/artisanal

Are you interested in this settlement opportunity?

Information request

Discover more about the province of Bergamo

Discover more

Details

Descrizione

At the time of the Municipality’s application for the AttrACT Call for Proposals (2017–2018), the detailed development plan (Piano di Lottizzazione) for the Via Panizzardo areas had not yet been submitted. Consequently, the municipal areas eligible for inclusion in the application were those located within the development sector, excluding part of the ecological collection site area, since it did not fall within the boundaries of the development plans as defined at that time by the general urban planning instrument. Therefore, the surface area indicated in the call for proposals was established at 23,700 square meters. Following the final approval of Variant No. 2 to the PGT (Territorial Governance Plan), which became effective on 27 May 2020, and at the initiative of the Panizzardo Consortium, the Municipal Administration amended the general urban planning instrument by designating the ecological collection site area as a productive (industrial/commercial) area as well, and by introducing a logistics use exclusively for the southern portion of the sector (former PL3). After the approval of Variant No. 2 to the PGT, on 10 March 2022 the Panizzardo Consortium submitted a detailed development plan in amendment to the PGT. The proposal envisaged the merger of part of the PL2 areas with PL3 and provided for the relocation of the ecological collection site to the central green area of the sector. This provision made it possible to increase the territorial surface area of the municipal land included within the implementation plan (Piano Attuativo), which rose from 23,700 square meters to 36,263 cadastral square meters, in compliance with the provisions of the current PGT.

Property

Public

Urban planning restrictions

No obligations

Remediation

Not necessary

Investment opportunity

Investment type

Sales

Price range for sales (€/m²)

Private negotiation

Competitive advantages

Accessibility to infrastructure and services
Near to main infrastructural networks on the Milan - Brescia route

Versatility and ease of development
Large size of the entire area subject to Preliminary Plan for Area Coordination with possibility of modifications

Versatility and ease of development
Multiple designated uses allowed

Most favoured sectors

All (except for those listed under investments not permitted)

Investments not permitted

The following manufacturing activities are subject to assessment of compatibility: fur and leather manufacturing industries; vehicle transport and/or storage with more than 3 heavy vehicles and/or land area greater than 500 m2; basic chemical industries; treatment of special and/or hazardous waste and industrial washing and cleaning of containers for chemical substances and oils of any kind; storage and treatment of inert materials and concrete production; industrial shining and cleaning of metals; activities that involve the use of mercury in the production cycle; industries whose production cycle includes galvanic treatments; activities whose production cycle includes industrial painting; rubber manufacturing; deposit and storage of combustible oils, fuels and gases, including for transport, with the sole exception of road distribution systems, etc. See art. 42 NTA PDR

Accessibility

Exit
A35 BRE.BE.MI - Caravaggio (BG)

3 km

Ex Strada Statale 11

< 1 km

Strada Provinciale 185

< 1 km

Railway Station
Caravaggio (BG)

1 km

Airport
Orio al Serio (BG) - BGY

25 km

Commitments and incentives by the Municipality

Semplification commitments

  • Guarantees that the Action Plan presented by the company is adopted by the City Council in less than 90 days from the date the request was registered.
  • Releases, upon a complete request being made, a Planning Permission in less than 60 days from the request.
  • Ensures an online 'front office' service or a dedicated section in the municipality's portal where investors or potential investors can find all useful information.
  • Uses and implements the 'electronic desk'.
  • Simplifies payments by creating a single contact for the payment of all expenses owed to the municipality and other entities.
  • Uses the SUAP [single contact point for productive activity] for proper additions to the Electronic Company File.
  • Guarantees a training course for the SUAP operators.
  • Participates in training programs related to the Electronic Company File.

Economic and fiscal incentives

  • Declares in advance all the urban planning and construction expenses, making sur not to introduce additional expenses.
  • Provides for an IMU [municipal property tax] + TASI [municipal tax on community services] tax rate of 8.5‰ in the areas identified.
  • Reduces the TARI [waste disposal tax] by 20% from the current amount.
  • Provides reimbursement of IMU and TASI debits and credits.
  • Reduces the primary and secondary land development expenses for the identified areas, as follows: Standard parameter of the Municipality: €/sqm 35.00 Improvement parameter for the identified areas: €/sqm 28.79
  • Reduces the qualitative standard and any expenses needed to change designation of use by 5%.

Qualified assistance to the investor

  • Provides preliminary consulting services and support to companies in the presentation and implementation of their projects, with the issuance of written opinions if requested in the proposal.
  • Holds regular meetings to solve any problems with the investment process and to provide support regarding methods for payment of local taxes.
  • Enables forms of collaboration with the credit institutions in the region.

If you have any questions, do not hesitate to contact us

Contact us