Skip to content. | Skip to navigation

Opportunity

Former Martinetta Lot 1 complex

Via XX settembre, 45 - 22069 - Rovellasca (CO)
Property

Private

Total GFA

16.283 m²

Reference sector

Industriale/artigianale

Are you interested in this settlement opportunity?

Information request

Discover more about the province of Como

Discover more

Details

Property

Private

Total GFA

16.283 m²

Buildable area

22.000 m²

Area and building dimensions

Available floor space for development 750 m2 offices (average H=3.3 m); 8,448 m2 warehouses (average H=5 m)

Reference sector

Industriale/artigianale

Urban planning restrictions

Scenery obligations, hydraulic obligation (the Lura River belongs to the main water grid)

Remediation

Not necessary

In case of interest, further detailed documentation is available

Investment opportunity

Investment type

Location

Price range for rent (€/m²)

25,00 - 45,00

Competitive advantages

Energy/environmental efficiency
Presence in the area of an active purification plant

Accessibility to infrastructure and services
Presence in the area of a well for industrial use

Competitive economic context
Near to the COMONEXT Science-Technology Park

Most favoured sectors

Activities related to the production and transformation of textiles, logistics and artisan activities

Investments not permitted

Industrial activities at risk of significant incident, activities not compatible with the existing environmental values

Accessibility

Exit
A9 Milano-Como-Chiasso - Turate

3 km

Exit
A36 Autostrada Pedemontana - Bregnano-Lazzate

2 km

Strada Provinciale 30

< 1 km

Railway Station
Stazione Ferroviaria di Rovellasca-Manera, linea Trenord Saronno-Como (CO)

< 1 km

Airport
Aeroporto Internazionale di Milano - Malpensa

40 km

Other
the area is reached from the Torrente Lura cycle route

Commitments and incentives by the Municipality

Semplification commitments

  • Guarantees that the Action Plan presented by the company is adopted by the City Council in less than 90 days from the date the request was registered.
  • Releases, upon a complete request being made, a Planning Permission in less than 60 days from the request.
  • Ensures an online 'front office' service or a dedicated section in the municipality's portal where investors or potential investors can find all useful information.
  • Uses and implements the 'electronic desk'.
  • Simplifies payments by creating a single contact for the payment of all expenses owed to the municipality and other entities.
  • Uses the SUAP [single contact point for productive activity] for proper additions to the Electronic Company File.
  • Guarantees a training course for the SUAP operators.
  • Participates in training programs related to the Electronic Company File.

Economic and fiscal incentives

  • Declares in advance all the urban planning and construction expenses, making sure not to introduce additional expenses.
  • Reduces the TARI [waste disposal tax] by 20% from the current amount
  • Provides reimbursement of IMU and TASI debits and credits.
  • Reduces the qualitative standard and any expenses needed to change designation of use by 20%.

Qualified assistance to the investor

  • Provides preliminary consulting services and support to companies in the presentation and implementation of their projects, with the issuance of written opinions if requested in the proposal.
  • Holds regular meetings to solve any problems with the investment process and to provide support regarding methods for payment of local taxes.
  • Enables forms of collaboration with the credit institutions in the region.

Download area


Floor plan

If you have any questions, do not hesitate to contact us

Contact us